Homeward bound Click on sail

 

The winter refit is complete and the Swallow fleet are currently enjoying their racing season.   A lot of major work was done this winter.

 

Exciting links              Swallow Summer work        New Swallow build Keelboat Homepage

 

 

HAINES BOATYARD
Swallow   Winter Refit 

 

Damaged rubbing strakes have been replaced on three swallows this winter.
The Swallows are brought down to Ferryside from our remote storage site a couple of weeks before they are due to be launched.  The work is then performed in our storage shed.  Once the work is complete, the yacht is  moved out, the mast stepped and the boat launched to the water ready for the sailing season.
The rudder on this swallow has been removed to gain access to the lower pintle which was loose. Repairs and adjustments were made and the rudder reassembled prior to the bottom being prepared and then antifouled before it was launched.
A replacement mast was required for this swallow.